INTEGRITY FUSION  |  SKU: 30092267  |  MPN: 600633

Orbital Scraper / Peeler | 360° Pipe Preparation | IPS & DIPS

$844.25
each
Size
  • 360° Surface Prep – Removes oxidation around the entire pipe circumference for clean, fusion-ready surfaces
  • IPS & DIPS Compatible – Covers a wide size range from 3/4" IPS to 6" DIPS depending on model
  • Precise & Consistent – Spring-loaded cutting action ensures uniform removal of surface material
  • Durable Construction – Built for long-term performance in municipal, industrial, and jobsite environments
  • Choose Your Model – INT-125 for 3/4"–4" IPS | INT-200 for 2-1/2" IPS–6" DIPS

Orbital Scraper / Peeler | 360° Pipe Preparation | IPS & DIPS — Product Overview

Integrity Fusion Orbital Scraper/Peeler Tools provide full 360-degree pipe surface preparation for electrofusion couplers, mechanical fittings, and sidewall saddle installations. By removing the oxidized outer layer from the entire circumference of the HDPE pipe, these peelers expose clean, virgin material—critical for achieving strong and reliable fusion bonds.

Orbital peelers deliver uniform cutting depth, smooth rotation, and durable job-site performance. Two models cover a wide range of IPS and DIPS pipe sizes from 3/4″ to 6″, making them essential tools for municipal water, gas distribution, industrial piping, and utility contractors.

Key Features & Benefits

  • 360° Surface Preparation – Scrapes the full pipe circumference for consistent fusion readiness.
  • Consistent Cutting Depth – Removes the required 0.007″ oxidation layer (per PPI recommendations).
  • Wide Size Coverage – Two models fit 3/4″ IPS through 6″ DIPS.
  • Heavy-Duty Construction – Rugged design with smooth bearing rotation for long service life.
  • Improves Fusion Reliability – Ensures clean, uncontaminated surfaces for electrofusion joints.

Common Applications

  • Electrofusion Couplers
  • Sidewall Fittings
  • Municipal Water Systems
  • Gas Distribution (per SDR)
  • Industrial Piping
  • HDPE Repair & Replacement Work

Orbital Scraper / Peeler Models & Specifications

Model Pipe Size Range Item Code
INT-125 3/4″ IPS – 4″ IPS 600633
INT-200 2-1/2″ IPS – 6″ DIPS 600634

Why Proper Pipe Preparation Matters

Removing the oxidation layer is the single most important factor for electrofusion success. HDPE pipe must be scraped to expose clean virgin material—typically 0.007″, approximately the thickness of two sheets of paper. Proper preparation dramatically increases the reliability and strength of electrofusion joints.

Refer to the downloadable product sheet for complete technical details and operation instructions.